Memphis Regional Megasite Industrial Park (Blue Oval Ford)

Memphis Regional Megasite Industrial Park (Blue Oval Ford)

Project Description:

This project consists of a greenfield four cell Sequencing Batch Reactor (SBR) plant to serve the Memphis Regional Megasite Industrial Park. The plant is located onsite of the Memphis Regional Megasite and has a design capacity of 5.1 MGD Biological / 10.2 MGD Peak and includes a headworks, four SBR cells, effluent filters, disinfection contact chamber, effluent pumping station, administration building, biosolids facility and controls. The effluent wastewater is pumped 37 miles to the Mississippi River.

 

Project Name: Memphis Regional Megasite Industrial Park (Blue Oval Ford)

Utility Name and Location: State of Tennessee, Stanton, Tennessee

Key Personnel: W. Scott Daniel, P.E., J. Greogry Davenport, P.E., Stephen C. Lee, P.E., Dwight Phillips, P.E. (Electrical Engineer)

Construction Cost: $64,000,000

Date of Completion: Expected Fall 2024

Engineering Services: Planning, Detailed Design, Construction Administration, and Resident Observation

Project Image

Project Image