Hiwassee River Wastewater Treatment Plant UV Disinfection System
Project Description:
This SRF financed project consists of the installation of a new ultraviolet disinfection facility to treat decanted water from the existing ICEAS basins before discharge to the Hiwassee River. The facility includes two ultraviolet disinfection systems capable of disinfecting a combined peak flow of 44.8 MGD, flow measurement equipment, electrical and controls building, standby generator, site piping ranging from 48-inch to 64-inch DIP, modifications to existing chlorine contact chambers, and connections to existing structures requiring partial shutdown of the treatment plant.
Project Name: Hiwassee River Wastewater Treatment Plant UV Disinfection System
Utility Name and Location: Cleveland Utilities Authority, Cleveland, Tennessee
Key Personnel: J. Gregory Davenport, P.E., Stephen C. Lee, P.E., Dwight Phillips, P.E. (Electrical Engineer)
Construction Cost: $7,414,000
Date of Completion: Summer 2024
Engineering Services: Planning, Detailed Design, Bidding and Award, Construction Administration, and Resident Observation